9
GENERAL INFORMATION
THE JOB BINDER
The job binder is a 2.5” white binder that contains specific information about the job
you are installing. The cover contains the job name and job number that is required
for technical support with Smartrise Engineering. This binder should be kept at the
jobsite at all times for future reference and troubleshooting.
COMPONENTS
The following components are included in each job binder.
1. Software
a. The binder contains a 256meg USB flash drive that contains all the software,
drawings and programs needed for each specific job.
2. Drawings or Prints
a. There are anywhere from 13 to 17 sheets of drawings that pertain to that
specific controller. These prints include an index indicating the job specifics,
tables that show correct dip switch settings, jumper settings for individual
boards, and factory and field wiring diagrams and generic wiring references.
i. The solid lines on the prints show factory installed wiring.
ii. The dashed lines show installer wiring.
b. If the voltages or wiring for your job does not match the Job Specification table
on the ‘Sheet 01: Getting Started’ page of the drawings, contact Smartrise
Engineering for clarification before powering up.
3. Manual
a. The Equipment Installation Manual contains useful information for installation,
testing, adjusting, troubleshooting, menu navigation and much more.
For the most recent version of our installation manual go to
www.smartrise.us, click on Support and download a pdf copy of our latest
release.
4. IO Sheets
a. All binders include an IO sheet that shows each board’s input & output
programming. This is very useful when locating a specific IO for installation
and/or troubleshooting and for recording changes in the SRU IOs.
5. Drive, Door Operator, and other operating manuals (optional)