Transport
Use cables as per DIN 3088.
To unload the mixer, use cables with a length (l) between the lifting lug and crane hook that
is at least the same as the outer diameter (d) of the mixer.
Fig. 28: Unloading 1
Do not cross the cables over.
Fig. 29: Unloading 2
NOTE
When attaching the lifting tackle, make sure that the motor and
discharge unit are not damaged�
Fig. 30: Loading methods