EasyManua.ls Logo

Teka THZ 375 - Preparation for Transport; Unloading and Transport

Teka THZ 375
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 39 of 957.10-00110b_en
Transport
5�6 Preparation for transport
Properly disconnect the machine from all energy supplies at the machine's location.
Remove all tools from the machine and package them appropriately.
Remove all mounting elements.
Secure all moving and unxed parts.
Close any open line ends.
If necessary, pump out uids and dispose of them in the correct manner.
5�7 Unloading and transport
I NOTE
The machines and associated packages are only allowed to be un-
loaded and transported by a specialist company or trained person-
nel who have been instructed in technical safety!
The centre of gravity must be observed during lifting.
Boxes must be labelled with a centre of gravity sign (ISO R/780 und DIN 55 402). Transport
bases do not have this sign.
I NOTE
The operating instructions form part of the machine and must ac-
company the machine in the case of a change of location�
I NOTE
For the weight of the machine, see the nameplate!

Table of Contents