TestingtheReelEngageSwitch(continued)
7.ThereelengageswitchterminalsareidentiedinFigure240andthecircuitry
oftheswitchisshownintheCircuitLogicTable(page7–67).Withthe
useofamultimeter(ohmssetting),testtheswitchfunctionstodetermine
ifcontinuityexistsbetweenthevariousterminalsforeachswitchposition.
Checkthecontinuitybetweentheswitchterminals.
CircuitLogicTable
SwitchPositionNormalCircuitsOtherCircuits
ON
2+35+6
OFF
2+15+4
Note:Thereelengageswitchterminals1and4arenotusedonReelmaster
5010machines.
8.Replacethereelengageswitchiftestingdeterminesthattheswitchis
damaged.
9.Ifthereelengageswitchtestingiscorrectandacircuitproblemstillexists,
checkthewireharness;refertotheElectricalSchematicandWireHarness
Drawings/DiagramsinAppendixA(pageA–1).
10.Afteryoucompletethetesting,connectthewireharnessconnectortothe
reelengageswitch.
11.Securethecontrolarmcoverstothemachine;refertoAssemblingthe
ControlArm(page8–25).
Reelmaster
®
5410/5510/5610Series
Page7–67
ElectricalSystem:TestingtheElectricalComponents
15216SLRevC