10.2 Cooling System Maintenance Schedule
Conduct monthly, quarterly, biannual and annual checks for the cooling system, according to the following guidelines. Refer to
Table 10.2 below
All tasks and time periods listed here are the manufacturers’ regulations and must be documented in an inspection report.
Component
Maintenance Period
Monthly By
User
Every
3Months
Every
6Months
Annually
General
Check unit display for clogged-filter warning X
Check for irregular noise from unit fans X
Check for irregular noise from compressor (if
applicable)
X
Check for irregular noise from remote
condenser fan(s) (if applicable)
X
Filters
Check state of filters X
Replace air filter if necessary X
Check filter switch functionality X
Blowers
Verify impellers move freely X
Check bearings X
Check motor mounts for tightness X
Check fan safety switch X
Electrical/Electronics
Check condition of contacts X
Check electrical connections X
Check operation of controller X
Check unit operation sequence X
Steam-Generating
Humidifier
Check cylinder and pan X
Check condition of steam hoses X
Verify filling solenoid valve is operating
properly
X
Cooling Water Circuit
(Water/Glycol and Chilled Water
Units)
Check circuit for leakage/general condition X
Check water (glycol) inlet temperature X
Check water regulating valve operation X
Check in/out water (glycol) Dt X
Check mixture glycol level (if applicable) X
Table 10.2 Maintenance Schedule
10 General Maintenance Proprietary and Confidential ©2024 Vertiv Group Corp. 111
Vertiv™ SmartRow™ 2 Infrastructure Solution User Guide