Maintenance1112−1/A1
Winterthur Gas & Diesel Ltd.
4/ 4
4. Foundation Bolts − Apply Tension
You must apply tension to the foundation bolts (metal and synthetic) in two steps as
follows:
1) Attach the pre-tensioning jack (94145) as given in paragraph 2, step 1) to step 8).
2) Apply a pressure of 900 bar to the foundation bolt.
3) Apply a pressure of 1500 bar to the foundation bolt. Keep the pressure constant.
4) Do step 10) to step 13).
2016
Bedplate and Thrust Bearing