EasyManua.ls Logo

Yamaha 200A - Page 201

Yamaha 200A
281 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
60H5E11
7
10. Connect the power trim and tilt motor leads
to the battery terminals, and fully retract the
trim and tilt rods. Measure the hydraulic
pressure while keeping the rods at fully re-
tracted position.
60h70380
11. Connect the power trim and tilt motor leads
to the battery terminals, and fully extend
the trim and tilt rods.
60h70390
12.If the hydraulic pressure falls within the
specification, remove the hydraulic pres-
sure gauge and down-relief fitting, and re-
install the manual valve and circlip.
If the hydraulic pressure is out of specifica-
tion, overhaul the power trim and tilt unit.
Power trim and tilt unit
7-20
Rods PTT motor leads
Battery
terminal
Green(G) +
DOWN
Blue(L) –
Hydraulic pressure (DOWN):
6-9 Mpa (60-90 kgf/cm
2
)
Rods PTT motor leads
Battery
terminal
Blue(L) +
UP
Green(G) –

Table of Contents