Advant
®
Controller 450 User’s Guide
Chapter 2 Installation
2-82 3BSE 002 415R701 Rev A
Summary of Aspects
Table 2-18. Implementation of Functions in Systems Already Operating
Function/Equipment
Enlargement/Addition
Dimensioning
of Data Base
Comments
On-line Off-line
System software X Yes
I/O module (S100, S800 I/O) X Yes
I/O subrack (S100 I/O) X (Yes)
(1)
(1) Braked (Yes) means that the requirement for dimensioning depends on the planned use of the equipment. For example, a new
subrack meant to reorganize available boards requires no dimensioning
I/O unit (S400 I/O) X Yes
Redundant processor module X No It is recommended that you shut
down the controller.
See alternative instructions below.
Redundant regulator 5 V X No
MasterBus 300 (all types) X No
GCOM X No
MasterFieldbus X (Yes)
(1)
Bus extension to S100 I/O X No The data base for S100 I/O Bus
Extension is pre-dimensioned.
When a new I/O subrack is added
in the system the corresponding
data base instance must be set
implemented.
Advant Fieldbus 100 X Yes
PROFIBUS-DP X Yes
LONWORKS Network X Yes
EXCOM X No
Printer X No
MasterView 320 X Yes
RCOM X No
MVI X No
Free-Programmable
Communication
XNo