Controller 450 User’s Guide
Chapter 2 Installation
2-82 3BSE 002 415R701 Rev A
Summary of Aspects
Table 2-18. Implementation of Functions in Systems Already Operating
Function/Equipment
Enlargement/Addition
Dimensioning
of Data Base
Comments
On-line Off-line
System software X Yes
I/O module (S100, S800 I/O) X Yes
I/O subrack (S100 I/O) X (Yes)
(1)
(1) Braked (Yes) means that the requirement for dimensioning depends on the planned use of the equipment. For example, a new
subrack meant to reorganize available boards requires no dimensioning
I/O unit (S400 I/O) X Yes
Redundant processor module X No It is recommended that you shut
down the controller.
See alternative instructions below.
Redundant regulator 5 V X No
MasterBus 300 (all types) X No
GCOM X No
MasterFieldbus X (Yes)
(1)
Bus extension to S100 I/O X No The data base for S100 I/O Bus
Extension is pre-dimensioned.
When a new I/O subrack is added
in the system the corresponding
data base instance must be set
implemented.
Advant Fieldbus 100 X Yes
PROFIBUS-DP X Yes
LONWORKS Network X Yes
EXCOM X No
Printer X No
MasterView 320 X Yes
RCOM X No
MVI X No
Free-Programmable
Communication
XNo

Table of Contents

Other manuals for ABB Advant Controller 450

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB Advant Controller 450 and is the answer not in the manual?

ABB Advant Controller 450 Specifications

General IconGeneral
BrandABB
ModelAdvant Controller 450
CategoryController
LanguageEnglish

Related product manuals