EasyManuals Logo

ABB Advant Controller 450 User Manual

ABB Advant Controller 450
564 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #244 background imageLoading...
Page #244 background image
Advant
®
Controller 450 User’s Guide
Chapter 2 Installation
2-90 3BSE 002 415R701 Rev A
4. Make a suitable dump of the application program:
Always make a source code dump of the PC program (DUPCS).
If there is no change in the system software compatibility code, make a dump of the
total data base (DUTDB).
If there is a change in the system software compatibility code, make a source code
dump (DUDBS).
Source code is always an option, but it is more time-consuming.
5. Shut down the controller (and thereby the entire process control) by switching the power
supply off. Use the circuit breaker S1 on the power switch unit(s) for mains A and
mains B. Do not disconnect mains C.
6. Extract the program card on the Processor Module PM511 located in the controller
subrack. Use the release push button.
CAUTION
Do not forget the general rule: Reflect on the danger of ESD. Use the
grounded wristband.
7. Insert the new program card.
CAUTION
At insertion, use the grounded wristband.
Start-up
Suitable data base and PC program dumps, per point 4 in the setup instructions above,
are presupposed.
The following instructions do not include any utilization of the new software functionality,
but only aim at restoring the “old” application. Enlargement of the application may require
redimensioning of the data base and the PC program tables as well. For relevant information on
these topics, look elsewhere in this manual or see separate documentation.
1. Follow the general instructions given in Section 2.6.7, Power-up Ahead of Program
Loading.
2. Perform the controller system configuration:
a. Load the data base dump, LOTDB or TRDBS, as applicable.
3. Perform configuration/application building:
a. Load the PC program dump, TRPCS.
4. Back up the entire RAM, DUAP.
5. Disable working mode CONFIGURATION, DICONFIG.
In addition to those indications obtained at power-up:
All red LED F (Fault) on S100 I/O board fronts are switched off.
The yellow LEDs INIT and INHIB on S100 I/O Bus Extenders
(DSBC 174/DSBC 176) board front are switched off.

Table of Contents

Other manuals for ABB Advant Controller 450

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB Advant Controller 450 and is the answer not in the manual?

ABB Advant Controller 450 Specifications

General IconGeneral
BrandABB
ModelAdvant Controller 450
CategoryController
LanguageEnglish

Related product manuals