$GYDQW
&RQWUROOHU8VHU¶V*XLGH
6HFWLRQ 0DQXDO2UJDQ L]DWLRQ
3BSE 002 415R701 Rev A 1-3
&KDSWHU,QWURGXFWLRQ
(this chapter) provides introductory and background information, including:
• Guidelines on how you can find information in this manual.
• This manual’s relationship to other Advant Controller 450 documents.
• A glossary defining terms frequently used in this manual.
• A product and functional overview. Read this to get an idea of what
the Advant Controller 450 can do and how it works.
&KDSWHU,QVWDOODWLRQ
guides you through various installation activities:
• Section 2.1, Site Planning Environment. This section contains guidelines for planning
installation of the product, outlining what you need to think about when you plan an
installation. It does not, however, provide the complete list of measures to take. You can
find descriptions of alternative solutions, design considerations elsewhere in this manual.
• Section 2.2, Setup. This section gives you concrete information on how to set up the
product. It includes safety regulations, handling and unpacking instructions, inspection
and assembly procedures, cable routing and connections, switch settings and jumper
positions, setup procedures, and so on. You can find common instructions as well as
instructions for specific subsystems in this section. Activities prior to power-up are also
described.
• Section 2.3, Shut-down Procedures. This section provides, in addition to some safety
regulations, basic shut-down procedures. You should know how to shut down the product
if there is a problem with initial power-up.
• Section 2.4, Start-up Procedures. In Section 2.2, Setup, the conditions and the preparation
necessary to begin are discussed. In Section 2.4, Start-up Procedures, you can find basic
power-up procedures, that is how to apply power to and initialize the system. Information
is also given on how you can verify a correct start. You can find information on activities
up to “ready for application program loading” in this section.
• Section 2.5, Product Verification. This section tells you how to make an initial
determination that the product is functional. This includes application program loading as
well as commissioning information.
• Section 2.6, Implementation of Functions in Systems Already Operating. This section
gives you the information you need to determine when, for example, to add an I/O board to
a running system. Important on-line, off-line aspects are discussed.