The standard cycle times obtained are given in the figure. For a more detailed description of the
configuration of cycle times, see the manual AMPL Configuration.
The allocation of priorities to the interpreters means that the execution of PC elements with
cycle times associated with interpreter C can be interrupted for the execution of PC elements
with cycle times associated with the interpreters A and B. The execution of PC elements with
cycle times associated with interpreter B can, however, only be interrupted by the execution of
PC elements with cycle times associated with interpreter A. The execution of PC elements
which are associated with interpreter A cannot be interrupted by the execution of other PC
elements.
Figure 4-14. Interpreters
Interpreter
A
Interpreter
B
Interpreter
C
10ms 20ms 40ms 50ms 100ms 200ms 250ms 500ms 1000ms 2000ms
Cycle time

Table of Contents

Other manuals for ABB Advant Controller 450

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB Advant Controller 450 and is the answer not in the manual?

ABB Advant Controller 450 Specifications

General IconGeneral
BrandABB
ModelAdvant Controller 450
CategoryController
LanguageEnglish

Related product manuals