EasyManua.ls Logo

ABB HP CP500 - Page 5

ABB HP CP500
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.3.3 Install the charge post on the foundation......................................................... 41
6.3.4 Install the cable gland plates................................................................................42
7 Electrical installation of the power cabinet...................................43
7.1 General procedure...................................................................................................................43
7.2 Connect the PE cables to the power cabinet.....................................................................44
7.3 Connect the AC input cable...................................................................................................44
7.4 Connect the DC power cables...............................................................................................45
7.5 Connect the AC auxiliary power cable in the primary power cabinet...........................46
7.6 Connect the interlock and DC guard cables.......................................................................47
7.6.1 Connect the interlock and DC guard cables to the primary power
cabinet.......................................................................................................................47
7.6.2 Connect the interlock and DC guard cables to the secondary power
cabinet...................................................................................................................... 48
7.7 Connect the CAN cables.........................................................................................................49
7.7.1 Connect the optical CAN cables between the charge post and the
primary power cabinet.......................................................................................... 49
7.7.2 Connect the analog CAN cables between the primary and secondary
power cabinet..........................................................................................................50
7.8 Connect the control cable for the tilt sensors to the primary power cabinet
(option)......................................................................................................................................52
7.9 Connect the control cable for the tilt sensors to the secondary power cabinet
(option)......................................................................................................................................53
8 Electrical installation of the charge post.......................................55
8.1 General procedure...................................................................................................................55
8.2 Connect the PE wire................................................................................................................55
8.3 Connect the DC power input cables....................................................................................56
8.4 Connect the AC auxiliary power cable................................................................................. 57
8.5 Connect the interlock and DC guard cable.........................................................................58
8.6 Connect the optical CAN cable............................................................................................. 59
8.7 Connect the Ethernet cable.................................................................................................. 60
8.8 Connect the control cable for the tilt sensors from the external customer
interface to the charge post (option)..................................................................................61
9 Prepare for commissioning..............................................................62
10 Access to parts.................................................................................. 63
10.1 Open the door of the power cabinet................................................................................... 63
10.2 Remove the plinth covers of the power cabinet............................................................... 63
10.3 Remove the DC busbar cover................................................................................................64
10.4 Remove the AC covers............................................................................................................64
Contents
9AKK107992A6488-EN | 004 5

Table of Contents

Related product manuals