EasyManua.ls Logo

ABB IRB 4600 Foundry Prime - Page 265

ABB IRB 4600 Foundry Prime
408 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Attachment screws: M8x40 quality Steel
12.9 Gleitmo and washers (24+24 pcs).
Lower the arm system against the base and
secure with the attachment screws and
washers.
10
Tightening torque: 35 Nm.
xx1800000882
Valid for Type C:
Apply some grease to the o-ring and refit
the o-ring between the cover and base.
11
Attachment screws: M6x16 quality 8.8-
A2F (5 pcs)
xx1800000879
Refit the cover plate at the bottom of the
base with its attachment screws.
12
xx1800000875
Remove the screws that secure the support
legs to the foundation.
DANGER
Stretch the roundslings to make sure that
the robot weight is secured.
13
Continues on next page
Product manual - IRB 4600 Foundry Prime 265
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
4 Repair
4.3.6 Replacing the base
Continued

Table of Contents

Related product manuals