EasyManua.ls Logo

ABB IRB 4600 Foundry Prime - Page 323

ABB IRB 4600 Foundry Prime
408 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InformationAction
xx0800000390
Applicable to motor axis 3!
Refit the bracket on motor axis 3.
14
Parts:
A: Motor axis 3
B: Bracket
Reconnect the motor cables.15
See the figure in:
Location of axis-1 and axis-2
motors, (Foundry Prime) on
page 314
Note
Make sure that the cover is tightly
sealed!
Applicable to motor axes 1 and 2!
Refit the cable gland and motor covers.
Make sure that the o-ring is in place!
16
How to fill oil in the gearbox is de-
scribed in sections:
Changing the oil, axis-2 gearbox
on page 167
Changing the oil, axis-3 gearbox
on page 171
Applicable to motors axis 2!
Refill gearbox oil.
17
If the gasket is damaged, it need to be
replaced.
Applicable to motors axes 3, 4, 5 and 6!
Make sure that the gasket on the cover on the
armhouse is intact.
18
Continues on next page
Product manual - IRB 4600 Foundry Prime 323
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
4 Repair
4.7.2 Refitting motors
Continued

Table of Contents

Related product manuals