EasyManua.ls Logo

ABB IRB 4600 Foundry Prime - Page 339

ABB IRB 4600 Foundry Prime
408 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
to the robot, before entering the robot
working area.
3
How to drain the gearbox is described in sec-
tion:
Changing the oil, axis-2 gearbox on
page 167
Drain the gearbox.4
CAUTION
Always cut the paint with a knife and
grind the paint edge when disas-
sembling parts. See Cut the paint or
surface on the robot before replacing
parts on page 201.
5
A
B
C
xx1100000946
A Cable bracket
B Cable bracket
C Cable strap
Loosen the cabling from the lower arm
by removing two cable brackets and a
cable strap.
6
CAUTION
The weight of the complete upper and
lower arm together is 205 kg
All lifting accessories used must be
sized accordingly.
7
Attach a roundsling around the upper
arm house.
8
Continues on next page
Product manual - IRB 4600 Foundry Prime 339
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
4 Repair
4.8.2 Replacing gearbox axis 2
Continued

Table of Contents

Related product manuals