EasyManua.ls Logo

ABB IRB 6640 Foundry Prime - Page 277

ABB IRB 6640 Foundry Prime
496 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Art. no. is specified in Required
equipment on page 274.
Upper arm including wrist unit:
Fit one of the pieces included in lifting accessory,
upper arm to the front attachment for lifting access-
ory on the upper arm.
8
Attachment point is shown in the
figure Location of upper arm on
page 273.
Note
The different attachment points,
depends on whether the wrist unit
is mounted or not!
Upper arm without wrist unit:
Fit the lifting accessory, upper arm to both attach-
ments for lifting accessory.
Art. no. is specified in Required
equipment on page 274.
Fasten the lifting tool (chain) onto the lifting eye,
the lifting accessory and an overhead crane.
9
Detailed in section Changing oil,
axis-3 gearbox on page 176.
Drain the oil from gearbox axis 3.10
Remove the cover on top of the motors, axis 3 and
4 and disconnect all connectors inside the motors.
11
Detailed in section Removing the
cable harness - upper arm on
page 225.
Remove the cable harness upper arm and place it
in a way that it will not be damaged in the proceed-
ing procedure of removing the upper arm.
12
CAUTION
The complete upper arm weighs 380 kg without
any additional equipment fitted! Use a suitable
lifting accessory to avoid injury to personnel!
13
Raise the lifting equipment to take the weight of
the upper arm.
14
Connect to connector R2.MP3
+: pin 2
-: pin 5
In order to release the brake of the axis 3 motor,
connect the 24 VDC power supply.
Note
When releasing the brake, the position of the upper
arm is adjusted to the position given by the lifting
equipment.
15
See Replacing motor axis 3 on
page 354.
Remove the axis-3 motor.16
Shown in the figure Location of
upper arm on page 273.
Carefully remove the attachment screws and
washers, upper arm.
17
Lift the upper arm and place it on a secure surface.
Make sure the lift is done completely level! In case
of necessary adjustments, use the shortening loops
on the lifting tool (chain), but make sure to place
the chain the right way through the loops!
18
Shown in the figure Location of
upper arm on page 273.
Remove the sealing, axis 2/3 from the lower arm.19
Continues on next page
Product manual - IRB 6640 Foundry Prime 277
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.4.4 Replacement of upper arm
Continued

Table of Contents

Related product manuals