Preparation of the tilthouse before fitting a new motor
Use this procedure for the preparation of the tilthouse before fitting a new motor.
NoteAction
xx1000000624
Clean the machined surfaces inside the
tilthouse as described in the figure.
1
Surfaces to be cleaned:
• A: at the position for the motor
flange
• B: at the position for the o-ring on
the motor
• C: at the position for the gasket.
See A in the figure above!Apply Loctite 574 on the machined surface
for motor flange previously cleaned.
2
For article number see:
• Additional equipment - Foundry
Prime on page 380
Preparation of motor axis 6 before fitting
Use this procedure for the preparation of a new motor axis 6.
NoteAction
For article number see:
• Required parts on page 379
xx1000000625
Only applicable if a new spare part is used.
Fit a new gasket on the motor by removing
the protection strip and paste it on the new
motor.
1
Part:
• A: Gasket
Continues on next page
Product manual - IRB 6640 Foundry Prime 383
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.6.6 Replacing motor axis 6
Continued