EasyManua.ls Logo

Allied Telesis x530 Series - Figure 47: Installing Four Brackets on the X530-10 Ghxm, X530-18 Ghxm, X530-28 Gpxm, X530-52 Gtxm or

Allied Telesis x530 Series
200 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 6: Installing the Switch on a Wall
124
Figure 47. Installing Four Brackets on the x530-10GHXm, x530-18GHXm,
x530-28GPXm, x530-52GTXm or x530-52GPXm Switch
3. After attaching the brackets, have another person hold the switch on
the plywood base on the wall while you secure it with the M4x32.3mm
screws included with the switch. Refer to Figure 48 on page 125 for
the x530-28GTXm or x530-28GSXswitch. Refer to Figure 49 on page
126 for the x530-10GHXm, x530-18GHXm, x530-28GPXm, x530-
52GTXm or x530-52GPXm switch.
Follow these guidelines as you position the switch on the wall:
Position it so that the front panel is facing up, left or right. Refer to
Figure 42 on page 116. Do not install it with the front panel facing
down.
Provide sufficient space from other devices or walls so that you
can access the front and back panels, and for adequate air flow for
ventilation.
4568
3 517911 13 15 17 19 21 23 27/S1
28/S2
25 SFP+
26
AT-x530-28GPXm
16 18 2014
10G
/1G
4 6810 122
22 24
FDX HDX COL
1G LINK
ACT
100 LINK
ACT
5G/2.5G/1G LINK
ACT
100 LINK
ACT
PORTS 21-24
PORTS 1-20
5G/2.5G/1G/100
CLASS
1
LASER PRODUC
T
CONSOLE

Table of Contents

Other manuals for Allied Telesis x530 Series

Related product manuals