EasyManua.ls Logo

Allied Telesis x530 Series - Plywood Base for Wooden Stud Walls

Allied Telesis x530 Series
200 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 6: Installing the Switch on a Wall
120
Plywood Base for a Wall with Wooden Studs
If you are installing the switch on a wall that has wooden studs, use a
plywood base for the device. (A plywood base is not required for a
concrete wall.) Refer to Figure 44.
Figure 44. Switch on the Wall with a Plywood Base
Mount the plywood base to two studs in the wall. The recommended
minimum dimensions of the plywood base for the switch is:
Width: 55.9 centimeters (22 inches)
Height: 61.0 centimeters (24 inches)
Thickness: 2.5 centimeters (1 inch)
The dimensions assume the wall studs are 41 centimeters (16 inches)
apart. You might need to adjust the width of the base if the distance
between the studs in your wall is different than the industry standard.
35179111315171921 23 27/S1
28/S2
25 SFP+
26
AT-x530-28GTXm
16 18 2014
10G/1G
46810122 22 24
FDX HDX COL
1G LINK AC T 100 LINK ACT 5G/2.5G/1G LINK AC T 100 LINK ACT
PORTS 21-24
PORTS 1-20
5G/2.5G/1G/100
CLASS1
LASER PRODUCT
CONSOLE
4592
Wall Studs
Wall
Plywood Base

Table of Contents

Other manuals for Allied Telesis x530 Series

Related product manuals