EasyManuals Logo

Allied Telesis x530 Series User Manual

Allied Telesis x530 Series
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #178 background imageLoading...
Page #178 background image
Chapter 9: Cabling the Networking Ports
178
Figure 66. Installing SFP+ Transceivers
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 to 4 to install
the remaining transceivers in the switch.
5. Remove the dust cover from the transceiver. Refer to Figure 67.
Figure 67. Removing the Dust Cover from an SFP or SFP+ Transceiver

Table of Contents

Other manuals for Allied Telesis x530 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Allied Telesis x530 Series and is the answer not in the manual?

Allied Telesis x530 Series Specifications

General IconGeneral
BrandAllied Telesis
Modelx530 Series
CategorySwitch
LanguageEnglish

Related product manuals