Chapter 6: Installing the Switch on a Wall
126
Figure 49. Securing the x530-10GHXm, x530-18GHXm, x530-28GPXm,
x530-52GTXm or x530-52GPXm Switch to the Plywood Base
4. Install the other switches of the stack.
5. Go to Chapter 7, “Building the Trunk with the Default SFP+ S1 and S2
10Gbps Stacking Ports” on page 131 or Chapter 8, “Building the Stack
with Gigabit or 5G Multi-speed Ports” on page 149.
35179111315171921 23 27/S1
28/S2
25 SFP+
26
AT-x530-28GTXm
16 18 2014
10G/1G
46810122 22 24
FDX HDX COL
1G LINK ACT 100 LINK ACT 5G/2.5G/1G LINK ACT 100 LINK ACT
PORTS 21-24
PORTS 1-20
5G/2.5G/1G/100
CLASS1
LASER PRODUCT
CONSOLE
4592