EasyManua.ls Logo

BD FACSCanto II - Unscheduled Maintenance

BD FACSCanto II
250 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
164 BD FACSCanto II Instructions for Use
Unscheduled Maintenance
Perform these maintenance procedures as indicated in the table.
Procedure Description and Location When to Perform
Replace cubitainers See Changing a Cubitainer on
page 166.
As needed
Prime fluid lines Removes air from fluid lines
See Priming Fluidics Lines on
page 169.
Whenever a fluidics line
is disconnected to change
a cubitainer or perform
other maintenance
Remove an air lock Removes air from filter and
restores flow of fluid
See Removing an Air Lock on
page 169.
When fluidics are not
functioning properly
(flow cell will not fill, or
there is backflush into
sample tube)
Clean external surfaces Keeps surfaces free from salt
buildup after exposure to sheath
fluid
See Cleaning External Surfaces
on page 171.
As needed
De-gas Flow Cell Removes bubbles from the flow
cell
See See Removing Bubbles from
the Flow Cell on page 172.
As needed during daily
startup
Clean Flow Cell Runs BD FACSClean solution
through the SIT and flow cell
See Cleaning the Flow Cell on
page 173.
When poor optical
performance indicates
additional cleaning is
needed
Bubble Filter Purge Removes air from the bubble
filter
See Purging the Bubble Filter on
page 174.
If fluidics run dry, or
when CVs are poor

Table of Contents

Other manuals for BD FACSCanto II

Related product manuals