EasyManua.ls Logo

BONFIGLIOLI Agile - Page 42

BONFIGLIOLI Agile
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VPLC / PLC 08/1040
40 VPLC / PLC 08/10
2387 - "INIT":
The status signal is TRUE for 64 ms:
after cut-in of supply voltage, or
after start of the PLC functions.
Otherwise, the signal status is "FALSE". The status signal cam be combined with Master Set and
Master Reset inputs and is used for initializing the functions.
2388 - "RESET":
The status signal is TRUE for 64 ms:
after cut-in of supply voltage, or
after start of the PLC functions or
after disabling of the output stages.
Otherwise, the signal status is "FALSE". The status signal cam be combined with Master Set and
Master Reset inputs and is used for initializing the functions.
2389 - "IDLE":
The status signal is TRUE if the output stages are disabled.
2390 - "Controller release":
The status signal is TRUE if the output stages are enabled and the magnetizing process has
been completed (flux forming finished; drive working).
2391 - "Controller release inverted ":
Inverted status signal of "Controller release".
2392 - "Error_acknowledgeable":
Status signal is TRUE if current error messages can be acknowledged.

Table of Contents

Other manuals for BONFIGLIOLI Agile

Related product manuals