EasyManua.ls Logo

Daikin D-BACS - Page 189

Daikin D-BACS
376 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
172 1.1 Features
intelligent Manager
1.1.4 Automated Operation Management
Before start
Air conditioning
ON
Comfortable
indoor temperature
Start of the day
Outdoor air supply saves energy.
Indoor temperature: 26
Indoor unit OFF
Ventilation fan on
(e.g.)Pre-cooling and pre-heating control realises
comfortable temperature at the start of the day.
Based on a predetermined schedule, the Manager
executes capacity control and intermittent operation of A/Cs so as
not to increase the discomfort index.
Reduces power consumption by 10 to 40%,
while maintaining room comfort.
Power limit control
This function switches the air conditioning system on before-
hand so that the temperature is just right when users arrive.
This function estimates the power consumption and oper-
ates at the maximum level within a limited range if the set
point is likely to be exceeded. This reduces power consump-
tion while maintaining comfort as far as possible.
· Alternative stop control of
indoor A/C units
·
Outdoor unit capacity control
(only for VRV)
During cooling operation, this function shuts down the
air conditioning equipment and brings in cool air from
outside when the system determines that the outdoor
temperature is lower than the temperature setting. Us-
ing outside air for cooling reduces energy consumption.
Power consumption prediction based control.
Provide more comfortable environment
· Flexible group configuration
· Set Point
· Real time control
· 30 minutes prediction time
OFF
100% 70% 40%
Automated control functions free the operator from the details of
daily operation management.
· Daily operation start/stop time settings
· Holiday settings
· Automatic switching to heating (fan) mode
· Automatic switching of temperature settings
Schedule Analogue interlock
Econo mode (option)
outdoor temp : 30
outdoor temp : 24
*
Please consult a sales representative on project basis.
*
Please consult a sales representative on project basis.

Table of Contents

Related product manuals