Operator info Additional information
GB is open The Generator breaker is open.
GB is synchronising The Generator breaker is synchronising.
GB open and stop not
possible in SWBD
While the controller is under switchboard
controller, operator actions cannot be
performed from the controller interfaces.
GB open cancelled
Opening the Generator breaker has been
cancelled.
GB open not possible
in SWBD
While the controller is under switchboard
controller, operator actions cannot be
performed from the controller interfaces.
Harbour operation
activated
Harbour operation has been activated.
Harbour operation
deactivated
Harbour operation has been deactivated.
Load-dependent stop
block activated
The Block load-dependent stop function is
active.
Load-dependent stop
block deactivated
The Block load-dependent stop function is
not active.
Load on busbar too
high
A shaft generator in power take home
mode cannot be connected to the busbar
because the additional load will cause a
blackout (overload on the busbar).
Load on SC too high
(Ship-to-ship)
The shore connection breaker will not
open because the load consumed by the
receiving ship is too high.
Load on SG too high
(PTH)
The shaft generator breaker will not open
because the load to drive the propeller is
too high.
Mode change locked
It is not possible to change to SEMI or
AUTO mode while the controller is under
switchboard control.
No genset ready to
start
There is no genset is in AUTO and Ready
for operation to take over the load after
opening the [Breaker].
Not in SEMI mode
The action cannot be performed unless
the controller is in SEMI mode.
Only one genset
connected
There is only one genset connected to the
busbar. Opening the generator breaker
will cause a blackout.
Pitch not zero
The shaft generator breaker cannot open
because the Zero pitch parameter is set
but not activated. Activate Zero pitch
before attempting to open the breaker.
Possible to remove
latches
There are acknowledged latched alarms in
the alarm list that can be reset.
PTH mode activated
The Power take home parameter is
activated.