DTX Series CableAnalyzer
Technical Reference Handbook
2-14
Step 1: Installing the Fiber Modules
1-1 Turn off the tester and smart remote.
1-2 Remove the cover from the back of each unit and
install a DTX-MFM or DTX-SMF module in each unit,
as shown in Figure 2-8.
Caution
Turn off the tester
before attaching or
removing modules.
amd34af.eps
Figure 2-8. Installing and Removing Fiber Modules
Caution
Leave the module bay covers in place when the
fiber modules are not installed.
Step 2: Checking the Battery Status and Verifying
Operation with Fiber Modules
2-1 Clean the tester’s connectors and the connectors on
two SC/SC patch cords. See Chapter 5 for details on
cleaning.
2-2 Connect the tester and smart remote together, as
shown in Figure 2-9.
2-3 Turn the rotary switch to SPECIAL FUNCTIONS.
2-4 Use
D to highlight Battery Status; then press
H. Press I when you are done.
2-5 Use
D to highlight Self Test; then press H.
2-6 Press
Pto start the self test.