Infratec™ 1241 Grain Analyzer
5:72 Service Manual 1001 5015 / Rev. 4
5.7 Preventive Maintenance Procedures
Preventive Maintenance of the Infratec 1241 consists of a series of checks that are
performed periodically to detect and prevent impending failures, see PM Protocol
part no. 1001 4569.
5.7.1 Measuring Unit Adjustment of Path Length
After any change or repair to the Measuring unit the path length must be checked us-
ing the Go/No Go ball gauge.
If there is a need for adjustment the measuring unit must be sent in for factory repair
as it is not possible to set the path lenght correctly without the proper tools.
• Go/no go ball gauge (Part. No. 1001 0661)