116
Chapter 4 Manual OS Installation
11 Installing high reliability tools.
To ensure stable server operation, refer to "Chapter 6 High Reliability Tools" (Jpg.153) and
install high reliability tools. Please install the RAID Management Tool when you configure
RAID.
The installation of Windows Server 2003 has completed.
z Before Starting Operation
After OS installation, refer to "Chapter 5 Operations after OS Installation" (Jpg.123) and perform the
necessary procedures.
4.2.3 Installing Linux
For the use of Linux, refer to the Fujitsu PRIMERGY website (http://primergy.fujitsu.com).