- 120 - eBike II, eBike II L, eBike II EL 2018112-069 Rev. F
• Disconnect the protective earth connector
• Open both strain reliefs for the connecting cable
(patch cable) ZME <-> LRE
• Connecting cable ZME <-> LRE is released.
• Pull the housing sidewards to pass the crank axis and
remove it.