EasyManua.ls Logo

GE eBike BASIC - Setting up the Ebike el

GE eBike BASIC
234 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 226 - eBike II, eBike II L, eBike II EL 2018112-069 Rev. E
eBike II L / EL - uncrating instructions - 221 -
removinG the transPort loCk
(eBike el only)
The transport lock is xed to the base frame with
2 screws (17 mm).
Unscrew carefully both screws with a wrench and
remove the transport lock.
Keep the transport lock and xing screws,
because the transport lock must be reinstalled
before transporting the ergometer.
Power and eCG ConneCtions
Refer to the eBike EL user manual for installation
of the power cable and ECG connection.
- 220 - eBike II L / EL - uncrating instructions
Unpack the paper roll and insert it in the holder.
settinG uP the eBike el
Move the eBike EL to the nal location and apply
the castor brakes.
Adjust the screw foot at the outrigger until it is
at on the oor..

Table of Contents

Related product manuals