2018112-069 Rev. F eBike II, eBike II L, eBike II EL - 99 -
• Disconnect the protective earth connector
• Open both strain reliefs for the connecting cable
(patch cable) ZME <-> LRE
• Connecting cable ZME <-> LRE is released.
• Pull the housing sidewards to pass the crank axis and
remove it.