GE HEALTHCARE
DIRECTION 2286865, REVISION 14 LOGIQ™ 7 SERVICE MANUAL
8-60 Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later)
8-2-11-4 Functional Checks
Perform the following functional tests to confirm the system is operational before returning the system
to the customer. If all are successful, include the following debrief script:
Table 8-8 Functional Tests
See
Section
Functional Test Debrief Script
4-2-2-1
Power Up
LOGIQ 7 Proprietary Service Manual, Direction
2286865, Rev 14, Section 8-2. Equipment
passed all required tests and is ready for use.4-2-2-2
Power Up Sequence