Applications Zoom20/30/35 Pro | 67
11.11.2 Layout
Description Search or enter points for setting out relative to the defined construction line. The on-screen graphics show
the position of the prism relative to the set out point. Below the graphic, the exact values are displayed,
combined with arrows to show the direction for setting out the point.
• Be aware that the line start point and the line end point are measured in the previous coordinate
system. When setting out these points they appear in the old system and appear as shifted.
• During use of the application the previous orientation and station parameters will be replaced by the
new calculated ones. The line start point will be set to E=0, N=0.
• The height of the line start point is always used as the reference height!
Access • Either, select New line from the Construction pre-settings screen and measure start and end points
of the line.
• Or, select Continue with line from the Construction pre-settings screen.
LAY-OUT The graphics are scaled to give a better overview. Therefore it is possible that the set out point moves in
the graphic.
Next step
• Either, press AsBLT to check point locations relative to a contruction line.
• Or, press Shift to enter offset values for shifting the construction line.
11.11.3 As Built Check
Description The As built screen displays the Line, Offset and d.d.Z of a measured point in relation to the construction
line. The on-screen graphics show the position of the measured point relative to the construction line.
The height of the line start point is always used as the reference height!
Access Press AsBLT from the LAY OUT screen.
AS-BUILT CHECK The graphics are scaled to give a better overview. Therefore it is possible that the station point moves in
the graphics.
AsBLT
To switch to AsBuilt mode to check points rela-
tive to the construction line.
Shift
To enter values for shifting the line.
Field Description
dLi Longitudinal offset: Positive if target point is further away than the measured point.
dOf Perpendicular offset: Positive if target point is to the right of the measured point.
d HG Height offset: Positive if target point is higher than the measured point.
LAYOUT
To switch to Layout mode to set out points.
Shift
To enter values for shifting the line.
Field Description
dLi Longitudinal offset: Positive if measured point is further along the construction line from the
start point.
dOf Perpendicular offset: Positive if measured point is to the right of the construction line.
dHGT Calculated difference in height: Positive if measured point is higher than the construction
line start point height.