7-83
MAINTENANCE
If Air Mixed Downstream of Common Rail
If air becomes mixed into the fuel system due to lack of fuel
and the engine is difficult to start, release air by following
the procedure below.
1. Following the above mentioned procedures, bleed
enough air up to the engine supply pump entrance.
2. Operate starter motor for long cranking within 20
seconds. If engine falls to start, return key switch to OFF.
Wait more than about 60 seconds, and then try again.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hitachi ZAXIS 120-6 class and is the answer not in the manual?

Hitachi ZAXIS 120-6 class Specifications

General IconGeneral
BrandHitachi
ModelZAXIS 120-6 class
CategoryExcavators
LanguageEnglish

Related product manuals