ResultsResults
To replace the component, reverse the removal procedure.
Removing and replacing the secondary three-slot riser cage blankRemoving and replacing the secondary three-slot riser cage blank
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have a T-10 Torx screwdriver available.
About this taskAbout this task
CAUTION:CAUTION: For proper cooling, do not operate the server without the access panel, baffles, expansion slot covers, or blanks
installed. If the server supports hot-plug components, minimize the amount of time the access panel is open.
ProcedureProcedure
1. Power down the server.
2. If installed, open the cable management arm.