EasyManuals Logo
Home>Intel>Chassis>SC5299WS

Intel SC5299WS User Manual

Intel SC5299WS
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #93 background imageLoading...
Page #93 background image
Intel® Entry Server Chassis SC5299-E DP/WS/BRP User Guide 75
4 Rack Mount Kit Install Instructions
(optional)
The Intel
®
Entry Server Chassis SC5299-E can be configured as a rack-mount chassis
when outfitted with the optional rack mount accessory kit.
Before You Begin
Before working with your server product, review the important safety information listed
in Appendix A, “Safety Information”.
Tools and Supplies Needed
Phillips* (cross head) screwdriver (#1 bit and #2 bit)
Needle-nosed pliers
Anti-static wrist strap and conductive foam pad (recommended)
System References
All references to left, right, front, top, and bottom assume the reader is facing the front of
the chassis as it would be positioned for rack-mount operation.
Setting up a Rack-configured Chassis
1. Observe the safety and ESD precautions listed in Appendix A, “Safety Information”.
2. Power down the server and unplug all peripheral devices and the AC power cable.
3. Lay the chassis down on its right side.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Intel SC5299WS and is the answer not in the manual?

Intel SC5299WS Specifications

General IconGeneral
BrandIntel
ModelSC5299WS
CategoryChassis
LanguageEnglish

Related product manuals