Figure 28: Unpacking an EX-series Switch
Table 30: Inventory of Components Provided with an EX-series Switch
QuantityComponent
1Switch
1Fan tray (preinstalled)
1Power supply (preinstalled if the switch uses a 320 W power supply; not preinstalled if the switch uses
a 600 W or 930 W power supply)
1Power cord retainer clip
2Mounting brackets
8Mounting screws
4Rubber feet
1RJ-45 cable and RJ-45 to DB-9 serial port adapter
1Virtual chassis cable (for an EX 4200 switch)
2Virtual chassis cable connector retainers (for an EX 4200 switch)
24Dust covers for ports (for an EX 4200-24F switch)
Unpacking an EX-series Switch â– 63
Chapter 3: Installing the Switch