Precision Seed Drills
162
MAXIMA 2
Optional equipment
Emptying the hopper
- Position a container close to the emptying hatch.
- Push lever (1) upwards to open the emptying hatch.
- Remove all seeds.
- Close the hatch.
- Empty transfer tubes (by shaking them).
Supply shut-off for a few rows
The 2 spacers (1) and (2) allow shutting off the product
supply of 1 to 3 rows.
- Remove bolts (1).
- Install the spacer or spacers.
- Reinstall bolts (1).
• Torque: 2.3 daN m (17 lbf ft).
Checking
During filling, rotate drive wheel by hand to check proper
functioning of the microgranulator and product flow. If no
product comes out of the application system, this
indicates there is a problem in the setting or that the
supply tube is clogged. Search source of malfunction
and remedy the problem prior to resuming sowing
operation.
Spacer (2) enables shutting-off the supply to one
row.
Spacer (3) enables shutting-off the supply to 2
rows.