Precision Seed Drills
74
MAXIMA 2
Instructions for work
$INSTRUCTIONS FOR WORK
1. Putting the machine into work
position
From the transport position:
If the machine is equipped with a fertilizer with
2x280 l (2x74 US gal) hoppers:
- Lower tractor lift linkage to position the machine near
to the ground.
- Remove tube clip (1).
- Position side marker disc on the machine outside.
- Insert and lock tube clip (1).
Repeat procedure for the other marker.
- Unlock side marker valve (1). (1 on each marker).
- Deploy the right or left side marker.
The machine is in working position.
Before placing the machine in working
position:
- Check that nobody is within the machine
pivoting area.
- If there is someone, make sure the
person moves away.