Precision Seed Drills
70
MAXIMA 2
Putting into service
- Lower the tractor three-point linkage to rest the
machine on the ground.
- Uncouple and place PTO shaft in support (1).
- Disconnect and store hydraulic hoses in holder (2).
- Disconnect and store control boxes in a dry and clean
place.
- Detach the top link from the machine end.
- Remove lynch pins (2).
- Remove the 2 pins (1).
- Lower the tractor three-point linkage.
The machine is uncoupled.