EasyManua.ls Logo

KUHN MAXIMA 2 - Page 72

KUHN MAXIMA 2
216 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Precision Seed Drills
70
MAXIMA 2
Putting into service
- Lower the tractor three-point linkage to rest the
machine on the ground.
- Uncouple and place PTO shaft in support (1).
- Disconnect and store hydraulic hoses in holder (2).
- Disconnect and store control boxes in a dry and clean
place.
- Detach the top link from the machine end.
- Remove lynch pins (2).
- Remove the 2 pins (1).
- Lower the tractor three-point linkage.
The machine is uncoupled.

Table of Contents

Related product manuals