GL16 Installation
2-3
7. Open the end frame doors. Remove the
following items (Figure 2-3):
One grease gun (A)
One Instruction Manual (B)
One 14 oz. (400 g) cartridge of high
temperature grease (C)
One l lb. (450 g) can of powdered wax
(D)
One gas pressure regulator (E)
One manual gas shut-off valve (F)
One roll of Nomex tie tape (G)
Required Tools
crowbar, sledgehammer, fork lift
Figure 2-2: Do not remove the guide tapes.
Uncrating
1. Before unpacking the unit, make sure the
proposed site is acceptable and any nec-
essary foundations have been prepared
(Figure 2-1). For more information within
this chapter, go back to the Site and Utility
Requirements section.
2. Remove the crating, strapping, and other
packaging materials except the guide
tapes (Figure 2-2), the protective plastic
cover, and the brown paper on the ironing
cylinder. Protective coverings should be
left in place so the unit will remain clean
until it is ready to use.
3. Remove the exhaust blower assembly
from the crate and set aside.
4. Carefully remove the unit from the skids.
Be careful not to drop or twist the unit.
Lift the unit from the end only. Never lift
in the middle.
5. The end frames of the unit should rest
firmly on the floor. If necessary, add shims
to level the unit. Secure the unit to its foun-
dation if required by local codes or condi-
tions. For use aboard a ship, the unit may
be welded at the foot pads.
6. After the unit is placed and secured, re-
move the plastic covers from the unit. Do
not remove the guide tapes or the brown
paper on the ironing cylinder.
Figure 2-3: Several items are supplied with each
unit.
A
B
C
D
E
F