GL16 Operating Guidelines
3-1
Chapter 3
OPERATING GUIDELINES
In order to operate the GL16 safely and with maximum efficiency, it is necessary to become familiar
with the following guidelines.
3.1 Safety Features
3.2 Operating Controls
3.3 Daily Operating Procedures
3.4 Operating Techniques
NOTE: It is extremely important that the daily operation of the unit be properly
supervised at all times. All operating and maintenance personnel must read,
understand, and adhere to the Operator Safety Reminders for CHICAGO
Flatwork
Ironer bulletin (Figure 3-1). This bulletin must be posted at the operating site.
Figure 3-1: The Operator Safety Reminders bulletin
must be read by all personnel.