6-2 TM80 Telemetry Monitor Service Manual 
 
Required materials 
BP10 module. For the specific BOM, see NIBP-related bill of materials, 
see9Maintenance Materials or consult Mindray engineers.   
 
Upgrade method 
Connect the BP10 module to the TM80 over MPAN as instructed in Chapter 10of 
BeneVisionTMS60 Telemetry Monitoring System/TM80 Telemetry Monitor 
Operator’s Manual. 
 
Verification method 
Start NIBP measurement on the BP10 module. Measurement results can be seen on 
the TM80 and CMS.   
 
 
6.3 Adding the Number of the TM80 Telemetry Monitors 
The number of the TM80Telemetry Monitors can be added flexibly. If you need to 
add one TM80 Telemetry Monitor, you only need to set CMS information in the TM80 
menu and admit the TM80 on the CMS. The new TM80 monitor can work in the 
system.   
 
Required materials 
TM80 monitor. For the specific BOM, see the chapter about maintenance material in 
the manual or consult Mindray engineers.   
 
Upgrade method 
See the Operation Manual and connect the new TM80 monitor to the CMS. 
 
Verification method 
Connect the TM80 to a simulator or human body or enable demo mode on the 
TM80. Relevant measurement results can be seen on the TM80 and CMS.