TM80 Telemetry Monitor Service Manual 3-63
Examples of AP layout
3.7 Network Deployment Implementation
This section describes the approximate process of network deployment, which is
performed by professional third party and adjusted according to actual conditions.
3.7.1 Preparations before Equipment Installation
1. According to the site test report, determine locations and install the
network cable and power supply cable.
2. Test the network cable and power supply cable for connectivity.
3. Prepare installation tools: mounting brackets needed by APs and
mechanical tools.
4. Ask the customer to provide climbing equipment (if needed) and
available time for operation (daytime, night and specific time).
Switch for CMS
Ward
AP AP AP