2-3. MAINTENANCE SCHEDULE
• To keep the copier in good operating condition and ensure an extended service life of the
copier, it is recommended that the maintenance jobs described in this schedule be car-
ried out.
• Carry out the maintenance jobs according to the PM Counter values.
PM Parts Maintenance
Cycle (K)
Part No. Qty Ref.
Page
PM Counter
Clean Replace
Paper Take-Up/Transport Section
Paper Take-Up Roll — 150 1164-3001-XX 1
☞ D-10
1st Drawer
Paper Dust Remover Assy 75 150 1165-0756-XX 1
☞ D-10
Other PM Parts 1,
Other PM Parts 2
Synchronizing Roller
bushings (upper and lower)
— 900 1164-3509-XX 4
☞ D-11
(✽2)
Synchronizing Roller gears
(upper)
— 900 1164-3515-XX 1
☞ D-11
(lower) — 900 1164-3508-XX 1
☞ D-11
Side Cover/Ventilation Fan
Section
75 ———
☞ D-12
Other PM Parts 1
Optical Section
Mirrors and lens 150 ———
☞ D-17
IR 2
Scanner rails/bushings 75 ———
☞ D-16
IR 1
Original Glass 75 ———
☞ D-17
Image Transfer Section
Image Transfer Roller Assy — 150 4011-0313-XX 1
☞ D-24
Other PM Parts 2
Comb Electrode 75 ——1
☞ D-24
Other PM Parts 1
Pre-Transfer Guide Plate 75 ——1
☞ D-25
Ozone Filter
(Europe)
— 150 4011-2032-XX 1
☞ D-25
Other PM Parts 2
(Except Europe) — 300 4011-2031-XX 1
☞ D-25
Other PM Parts 3
Developing Section
Imaging Cartridge
☞
I/C Life 1
(25-cpm copier) — (✽1) ——
☞ D-26
(35-cpm copier) — (✽1) ——
☞ D-26
Fusing Section
☞
Fusing Unit
(100-V series 25-cpm copier) — 300 4012-0321-XX 1
☞ D-27
(200-V series 25-cpm copier) — 300 4012-0322-XX 1
☞ D-27
(100-V series 35-cpm copier) — 300 4011-0321-XX 1
☞ D-27
(100-V series 35-cpm copier) — 300 4011-0322-XX 1
☞ D-27