EasyManua.ls Logo

Mitsubishi Electric QJ71GF11-T2 - Page 198

Mitsubishi Electric QJ71GF11-T2
568 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
196
Submaster station (station number 2)
2. Write the program to the CPU module on the master station, local station, and submaster station.
Then reset the CPU module or power off and on the system.
Perform the operations above in order of the master station, local station, and submaster station.
[Online] [Write to PLC]
3. Set the switch on the CPU module to RUN.
Receiving process from
the station No.1
Sending process of the own station
(submaster station)
Receiving process from the master station
(submaster operating station process)
Sending process to the station No.1
(master operating station process)
Sending/receiving processes
with the station No.1
Create programs of the same structure as "Sending/receiving processes with the station No.1"
by the number of slave stations (exclusive of the master station).
Change the interlock of SW00B0 according to the station numbers.
Sending/receiving processes
between the master station
and submaster station
or Power OFF ON
RESET
RUN

Table of Contents

Related product manuals