EasyManua.ls Logo

Mitsubishi Electric QJ71GF11-T2 - Function: SREAD Instruction Overview; Target Stations that Can be Specified;Checking the Execution Status of the SREAD Instruction

Mitsubishi Electric QJ71GF11-T2
568 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
259
CHAPTER 10 DEDICATED INSTRUCTIONS
10
10.5 JP/GP.SREAD (Reading Data from the Programmable Controller on Another Station)
(2) Function
(a) SREAD instruction overview
The instruction reads data by the specified number of words (control data ((S1)+9)) from the target station start
device (S2) into the own station word devices (after (D1)).
Specify the target stations in control data ((S1)+4 and (S1)+5).
When the reading of the data specified in (S2) is completed, the following devices are turned on.
Own station: Completion device (D2)
Target station: Read notification device (D3)
(b) Target stations that can be specified
For details on target stations which can be specified, refer to the following.
Page 236, Section 10.1 (1)
(c) Checking the execution status of the SREAD instruction
The execution status (completion or error) of the SREAD instruction can be checked using the following
devices specified in the setting data.
Completion device (D2)
This device turns on in the END process of the scan where the SREAD instruction is completed and turns
off in the next END process.
Completion status indication device ((D2)+1)
If the SREAD instruction fails, this device turns on in the END process of the scan where the SREAD
instruction is completed and turns off in the next END process.
Channel 1
Channel 2
CPU module CPU module Network moduleMaster/local module
(D1) (S2)
SREAD
[Own station] [Target station]

Table of Contents

Related product manuals