(2) Procedure before operation
Check box
Consider the system configuration and link device assignments.
System consideration
Installation
Mount the master/local module to the base unit.
Unit test
Perform a unit test on each module.
Wiring
Connect an Ethernet cable to each module.
Configure "I/O assignment settings" and "Switch settings for I/O and
intelligent function module."
Intelligent function module switch setting
Programming
Create programs for parameter setting and data communication.
Debug
Debug the programs, checking the status of the LEDs and error codes.
Page 64, Section 6.2
Page 68, Section 6.3
Manual for slave stations
Page 63, Section 6.1
Page 533, Appendix 7 (3)
Page 535, Appendix 7 (4)
Page 206, CHAPTER 9
Page 48, CHAPTER 5
Page 124, Section 8.1.1