Chapter 2: Shipment
15
Chapter 2: Shipment
General
Unpacking
MKS has carefully packed each unit so that it will reach you in perfect operating order. Upon
receiving the unit, however, you should check for defects, cracks, broken connectors, damaged
cables etc., to be certain that damage has not occurred during shipment.
Note
Do not discard any packing materials until you have completed your
inspection and are sure the unit arrived safely.
If you find any damage, please notify your carrier and MKS immediately. If it is necessary to return
the unit to MKS, obtain an ERA Number (Equipment Return Authorization Number) from the MKS
Service Center before shipping. Please refer to the inside of the back cover of this manual for a list
of MKS Calibration and Service Centers.
Unpacking Checklist
• Mass flow controller
• Mating connectors
• GSD file (CD) (for Profibus only)
• Manual (this book)
• Calibration sheet
Optional Accessories:
Control units, power supplies, readout units
Cable
Profibus Support Kit: 1179-PB-SUPPORT
for units with profibus only