Chapter 3: Installation
23
Finishing the Installation
1. Check all fittings and flanges for leaks.
Do not proceed with the next step until you have not made sure that there are no leaks.
2. Connect the interface cable(s) to the mass flow controller.
Connect the other end of the cable to the power supply/control electronics.
Check all electrical connections.
This ends the mass flow controller’s installation.